Wednesday, 5 April 2017

2017FAL Quarter 2 :: My List

Quarter 1 saw a list of 29 unfinished projects drawn up.  Only 7 projects were finished in these three months, but I also did start and finish some projects that weren't on the list, and 6 projects were worked on but not completed - that's got to count too right?!!!  So the question is how many do I roll over?  And how many more do I add to the list?!!!

Here goes:

Projects with a time deadline:

1.  Churned to a T - finish quilting, bind and add hanging sleeve


2.  Pools of Blue - I have an challenge mini quilt to make for Cottonopolis at Festival of Quilts.  This fabric pull is from all my old scraps and remnants and I hope it will make a good improv (if not I have some Kona cotton standing by!)


3. Rainbow Star Mini No 3 - whilst playing around with EQ7 I came up with similar but different design and I would like to see how they compare in real life. 


4.  A Study in Triangles - this is a piece for the Art with Fabric Blog Hop  UPDATED 16/05/17 this is finished and blogged about here


5.  Cot Quilt - this is the fabric choice for a cot quilt and I have a design ...... somewhere!  I drew it up on a loose of paper so who knows where that may be?  I remember what it was and it was a loose plan with a lot of make it up as you factored in!


6.  Riley Blake Challenge - the challenge is I have had the fabric for over 2 months and I still don't know what I am going to do!  UPDATED - this was not done in time - sadly I was uninspired by this challenge but having seen other entries I wish I had thought harder!


7.  Liberty and linen Easter/spring bunting to be made.




Almost done - so these really should get finished this quarter!

8.  Finish making these samples from trying the Quick Curve Ruler into pouches - one down, one to go.


9.  Make this block into a cushion cover - I am either super early or rather late!  My tutorial to make this block can be found here.  I felt rather ashamed because other people who used this tutorial had their cushions all finished and in use for Christmas whilst mine languished in my studio.  This is now bordered and quilted only the final step to go!


10.  Turn these two blocks from the Bee Hive into a cushion- these are now quilted and just need making into a cushion


11.  Make this block into a cushion cover - this is now quilted and just needs making into a cushion cover.


12.  Charley Harper mini quilt - whilst the one for the swap has been made, sent and received I was making one for me alongside.  This needs quilting and binding.



Ready to be quilted:

13.  My Bee Hive quilt from 2016 - all pieced, backing ready just need to get it quilted.


14.  My daughter's Feather Quilt - quilting and binding to be done.  Need to work our quilting design and get this done ..... hopefully first or second up.


15.  My Christmas Quilt - quilting and binding to be done.


16.  Quilt this Beatrix Potter embroidery quilt for my Mum.



Rolled over projects:

17.  A Caravan Tote.  I have now got all the interfacings required for this - this has been on my list for ever ......


18.  A Happy Birthday bunting - it's my birthday next in the family and I would love a bunting up having given away our other one.


19.  Turn these crocheted hexagons into something - the item in the background is very rigid interfacing because I am thinking a bucket/basket type thing!


20.  Radiance Wholecloth design challenge - everything about this is new to me and rather scary at the moment but hopefully it will all fall into place.




21.  Back to Front quilt - finish top, quilt and bind.


22.  Turn these spare blocks from my Polaroid cot quilt into a small quilt for Project Linus.


23.  Make another Lighted Houses piece from an Anne Hellyer workshop - it didn't get made in time for Christmas so I had to gift the one I made for me!


24.  Decide what to do with this!  It was a jelly roll race quilt I started making for my daughter, before she changed her mind.  The top is actually finished but as she doesn't want it anymore I'm not sure whether to cut and re-use the fabric in something different - any ideas?


25.  Christmas Tree wall hanging - do you see a theme here?!!  I am going to be well prepared for this Christmas!


26.  Finalise my Union Jack flag pattern and get it out there!  It is so close, what's really stopping me is the technical side required to convert to a .pdf but hopefully I will now be able to concentrate and get this done.


New projects for the list!

27. Sewing Machine


28.  Stash Bee quilt - these are blocks from Stash Bee 2016 Hive 5 and Stash Bee 2017 Hive 8.  I recently pieced them whilst on retreat in Jersey and now have to quilt and bind.  I love this quilt so it will be a pleasure to do!



29.  Union Jack - this is a small Union Jack piece from the pattern I designed last year.  Not quite sure what I had in mind with this one but I think I will finish and make it into a cushion.


30.  Italian Houses - started in a workshop with Gillian Travis 18 months ago .... enough said!


Wow I guess I stuck with my habit of making a long list!  Have you linked up yet?  There's still time if you haven't - grab a photo of all your WIPs/UFOs and then do a quick blog post and link up here - the linky party is open until Saturday 08 April.

I am going to be linking up with Let's Bee Social today aswell!

Tuesday, 4 April 2017

2017 Finsh-A-Long :: Quarter 2 Link Up


It's time to link up your list of unfinished projects that you propose to finish in Q2 of the FAL. I truly hope you are facing a new quarter with a brand new list - because you finished so many UFOs in Q1!  If not don't worry and roll over the projects to get them done this quarter.

The FAL is hosted by a community of bloggers across the world. Our hosts are:
  • Sarah - Sew me - Northern Ireland
Social Media Director
For those of you who are new to the FAL, it is a place to find motivation and encouragement to complete those unfinished projects that are hanging about becoming UFOs. Every quarter you post a list of projects you hope to finish in the next three months, and then at the end of the quarter, you post a link from your blog, Flickr or Instagram of each successful finish from your original list.

Each finish is an entry for wonderful prizes from our sponsors. There is no penalty for not finishing a listed project, so feel free to make your list long or short, as you wish. The 2017 Schedule and Rules for the FAL are on my permanent FAL page, let me know if you have any questions.

Here are the fantastic and generous sponsors for Q2 of the FAL - you can see each of their prizes listed under their logo (think about visiting them and saying thank you):  



As you may recall from last year, there was a return of tutorial week at the end of each quarter, between the opening of the link for finishes and the day that link closes. Are you enjoying this? Please share your thoughts in the comments section below! This will take place each quarter. Each host works hard to put these together so I hope you are visiting their blogs to encourage them. If you have a tutorial that you would like to share, please let me or another host know.

It's time to round up those projects you want to finish over the next three months, take a photo of each one and make your list. Please ensure that you have at least started your projects - pulled fabric with a pattern is now considered a UFO, and remember it is only finished projects that will get you an entry toward the above listed prizes. So while we love to see your bee blocks, the "finish" is when they are a completed, usable project.

It is very helpful if you tag your list as #2017FALQ2yourname when posting on social media: Flickr, Facebook & Instagram. Using the same hashtag over the quarter when sharing progress or finishes before the link, helps the hosts find your original list quickly - especially when this is done over a 3 month period. IMPORTANT: Don't forget to link your finishes up when the quarter closes.

The 2017 Q2 link for your list of proposed finishes is now open below on my blog and on each of the hosting blogs. You need only link your list once, on one blog - and that link will show up on all of the blogs. If you are using Facebook, Flickr or Instagram, link a mosaic and put your list in the description. Katy of The Littlest Thistle has a great tutorial on how to link-up if you need it.

We also ask that you become part of the FAL community. Please check out the links of others - visit and comment on their lists. We all need encouragement to get those finishes done, so please share some of your own too. When creating your list there is one thing to remember....No deductions for not completing something so ..... Aim High! Nothing to lose!!! Well Now..... Get those lists together and get linked up. 




The Q2 proposed finish linky party will stay open until 11 pm EST, April 8, 2017- as we are global, you might want to check your time zone to determine your last possible time to link. Remember: you only need to link up on ONE hosting blog and it will automatically show up on all hosting blogs. ____________________________________________________________________________

Friday Finish :: Fraktal Quilt

Taken from website blog before website closed down  05 March 2021 It has been a very long time sine I have had a Friday Finish and so I am d...